Has an EICR identified electrical faults in your commercial premises? MCI Electrical completes the remedial work needed to address damaged accessories, inadequate protection, earthing defects and unsafe circuits, then tests the affected installation. Businesses across Eastleigh and Southampton receive a clear record of what was corrected.

## How this is priced

Labour is charged by the hour with each item priced on its own line, so you can see what every repair costs before you commit to it. Quotes are free and there is no callout fee.
- EICR remedial works: £65/hr
- Covers electrician labour to rectify C1, C2, and FI fault codes identified on your EICR.
- Materials, replacement distribution boards, and switchgear are invoiced separately.
- Access equipment for high bay lights or high level containment is not included in the hourly rate.

## What remedial work actually involves

A condition report lists what it finds as codes, and this work is simply clearing those codes one by one. I read the report through, tell you what each line means in plain English, and price the items separately so you can spread them if you want to.
- **Resolving C1 and C2 codes:** C1 items represent immediate danger and require prompt isolation. C2 items show potential danger, such as damaged trunking in Millbrook trading units or ungrounded metalwork in Segensworth workshops.
- **Clearing FI items:** Further investigation codes occur when circuits cannot be fully checked during testing. This includes tracing unidentified main cables in shared buildings along Bournemouth Road in Chandler's Ford.
- **Updating schedules and labelling:** Old boards in Barton Park or town centre retail spaces often lack circuit identification. Remedial work includes updating schedule cards so circuits match the actual distribution.

## What is and is not included

It covers the labour to clear the coded items on your report. Materials, replacement boards and access equipment for anything high up are quoted separately.

### Included
- Fixing exposed live parts and damaged switchgear
- Replacing overloaded or outdated circuit breakers
- Repairing broken cable containment and trunking
- Tracing and resolving circuit short faults or missing earthing connections
- Updating distribution board schedule cards and circuit labelling

### Not included
- Initial fixed wire testing and initial inspection logging
- Hiring scissor lifts or boom lifts for high level warehouse containment
- Routine bulb or lamp replacements on working luminaires

## Before I arrive

Send me the report before I come and I will read it through, so the visit is spent doing the work rather than working out what the codes mean. Whoever carried out the original inspection is fine by me.
1. **Provide the original EICR:** Ensure the full inspection report and circuit schedules are available before work begins.
2. **Clear access to distribution boards:** Keep area around main switchgear, distribution boards, and affected equipment clear of stock or obstacles.
3. **Notify affected staff:** Power interruptions may be necessary while circuits are isolated and repairs are carried out.

## What you are left with

Each item is signed off as it is completed, and you get the paperwork the same day the work finishes, with a plain English note of what was done and anything you have chosen to leave for later.
- **A satisfactory report:** Once all C1, C2, and FI items are rectified, an updated report confirms the installation is satisfactory.
- **Certificates for the new work:** You receive Electrical Installation Certificates or Minor Works Certificates for the specific replacement components and alterations installed.
- **A shortened list:** Remaining items on your report will only consist of C3 improvement recommendations, which do not make an installation unsatisfactory.
- **The next retest date:** Your documentation will confirm the recommended date for your next formal periodic inspection.

## Questions I get asked

The questions I get asked most about clearing a condition report.

### Do I have to rectify C3 codes to get a satisfactory EICR?

No. C3 codes are recommendations for improvement rather than dangerous defects. As David McInnes, I advise addressing C1, C2, and FI items first, as those are the codes that cause an EICR to be unsatisfactory.

### Can remedial work be completed without shutting down my whole business?

In most cases, yes. I isolate individual circuits wherever possible so that other parts of your premises in Eastleigh or Segensworth remain operational while repairs take place.

### How long do I have to complete EICR remedial work?

Commercial premises must address dangerous conditions quickly. Standard guidance requires C1 and C2 codes to be resolved within 28 days or as specified on the inspection document.

### What happens if an FI code cannot be investigated easily?

FI codes require further investigation to confirm safety. Tracing obscured cabling or unlabelled main cables takes time, but it is necessary to complete the overall safety assessment.

## Where the rules come from

The official rules behind this work, straight from the source.
- [Electricity at Work Regulations 1989](https://www.legislation.gov.uk/uksi/1989/635/contents/made): Statutory requirements for maintaining electrical systems in commercial and industrial premises safely.
- [HSE, electrical safety at work](https://www.hse.gov.uk/electricity/): Health and Safety Executive guidance on managing electrical risks, maintenance, and testing in workplaces.

## Business facts
- Based: 1 The Drove, Horton Heath, Eastleigh, SO50 7NX
- Service area: Eastleigh, Whiteley and Segensworth, Chandler's Ford, Hedge End and Botley, Southampton and the docks
- Hours: Mon, Tue, Wed, Thu, Fri 09:00–17:00
- Phone: +447366896562
- Email: team@mci-electrical.co.uk
- Years of experience: 17
- Pricing rules: Fixed wire testing is priced on the number of boards and circuits, not by the hour.; Emergency lighting is priced per light, and the three hour test is priced separately.; Repairs are priced item by item off the report, so you choose what to do and when.; Work outside your trading hours costs a different rate, and I tell you what it is before I set off.; Quotes are free, rescheduling is free, and there is no callout fee.

## Request a quote
- [Start a request](https://mci-electrical.co.uk/#chat): Send the job details and postcode to MCI Electrical.

## Related pages
- [Fixed wire testing](https://mci-electrical.co.uk/services/fixed-wire-testing): Fixed wire testing and commercial EICR.
- [Distribution board replacement](https://mci-electrical.co.uk/services/distribution-board-replacement): Distribution board replacement.
- [Commercial fault finding](https://mci-electrical.co.uk/services/commercial-fault-finding): Commercial fault finding and repair.
- [Full sitemap](https://mci-electrical.co.uk/sitemap.md): Complete machine-readable page directory.