Three-phase power in Chandler's Ford
MCI Electrical installs three phase power for commercial premises in Chandler's Ford, bringing a 400 volt supply to your machines with marked circuits, tested cabling and a certificate.
Calls answered 24/7
- 17 years trading
- Local to Eastleigh
How is three phase power installation priced?
The starting price covers a straightforward install for a small workshop or kitchen: the cable, the isolation at each machine and the ways marked on the board. Bigger jobs are priced from the loads on your list.
From £1,400
- Bigger loads, long cable runs from the intake and a new connection from the network operator, the company that owns the local supply, are priced after a site look.
- Fault finding on a supply that is already failing is charged apart from the installation.
- VAT and any network operator charges appear on the written price, which names each load and the cable size.
- No callout fee applies, and a booked date can move without any charge.
Three-phase power across Chandler's Ford
We serve Chandler's Ford from our base in Eastleigh.
What happens on the day
Three phase is a 400 volt supply carried on three live cables, the kind that drives motors, ovens and compressors. The work follows a fixed order, from checking the intake to switching on the new circuits with you present.
- Surveying the intake and loadsWe look at where the mains supply enters the building, the earthing and the existing board, then list every machine that needs the new supply. That list decides the cable size and the number of ways, the spaces on a board where each circuit connects.
- Isolating the boardOnly the board we are working on is switched off and made safe. Lighting and sockets on other boards stay on where the layout allows, so the business keeps trading while the work goes on.
- Running cable and fitting isolatorsWe pull the three phase cable from the board to each machine and fit an isolator at every load. An isolator is a switch that cuts power to one machine so it can be worked on safely. The cable run is planned around racking, aisles and kit already in place.
- Testing and switching onWe test continuity, insulation and polarity on each new circuit, then switch on with you there to watch the machine run. The certificate for the new circuits and the test results stay with you, along with a simple layout of the new ways on the board.
How booking works
Tell us about the job
Tap Book Now and describe the work in the chat. Photos help.
Get your price
You see your price in the chat. A set price is paid at checkout; any other job is quoted first.
Choose your visit
Give your address and when you are free, and the visit is arranged.
Follow your job from booking to receipt
See when we're on our way, get your job report the moment we finish, and pay in seconds.
Track us on our way
See us on the map with a live arrival time.
Your job report, same day
See exactly what was done as soon as we finish.
Invoice and receipt in one place
Pay online in seconds, and your receipt is always there when you need it.
Why choose MCI Electrical
- Trading since
- 2009
“I have worked on commercial premises across Eastleigh and Southampton since 2009. I quote the job, do the work and sign it off myself, so you always deal with the person who knows your building.”
David McInnes, MCI Electrical
Book NowPhotos of our work
Do you install three phase power in Chandler's Ford?
Yes. MCI Electrical fits three phase supplies in commercial premises across the SO53 area, from Tollgate Business Park and School Close Industrial Estate to Hampshire Corporate Park and Bournemouth Road. The work covers cabling, isolators and board ways for the machines you name.
How soon can I book three phase installation?
Press Book Now and list the machines that need the supply. A site look comes before the written price, and a booked date can move later at no charge.
Can my building take three phase?
It can when the incoming supply is already three phase and the board has spare ways. A building on a single phase supply needs the network operator involved first. We check the intake on the first visit.
Have you installed three phase supplies before?
Yes. Three phase installation sits beside our other commercial electrical work, including board replacement, fixed wire testing and power for machinery. The same firm carries out each job and issues its certificate.
What happens after I book?
We ask which machines need the supply, then look at the intake and boards on site. You then receive a written price naming each load, the cable size and where the new isolators sit. The install follows once you accept it.