Commercial distribution board upgrade in Chandler's Ford

MCI Electrical replaces and upgrades distribution boards for businesses in Chandler's Ford, leaving a new board with named circuits, a schedule and a test certificate.

Calls answered 24/7

  • 17 years trading
  • Local to Eastleigh

What affects the cost of a new distribution board?

The price depends on the size of the board, the number of ways it needs and the supply it connects to. We give a written quote once we have looked over the board in place and what it feeds.

From £950

  • A larger three phase board, which serves bigger motors and plant, or extra ways, adds to the price.
  • Extra circuits, data cabling or emergency lighting fitted during the same visit are quoted on their own lines.
  • A quote is free, moving the booking costs nothing and we charge no callout fee.

Prices for commercial distribution board upgrade

Commercial distribution board upgrade across Chandler's Ford

We serve Chandler's Ford from our base in Eastleigh.

Chandler's Ford Industrial EstateHampshire Corporate Park, Templars WayTollgate Business ParkSchool Close Industrial EstateBournemouth RoadHursley Road and FryernLeigh Road towards EastleighSO53

What happens on the day

A board change follows a set order, from checking the old unit to testing the new one. MCI Electrical quotes, fits and tests the board itself.

  • Checking the old board and the loadWe look at the existing board and the circuits it feeds, then isolate the supply so the unit is dead before anything is touched. Where the network operator has to be involved in isolating the incoming supply, that is arranged first.
  • Swapping in the new boardThe old unit comes off the wall and the new distribution board goes up in its place. The incoming tails are connected and each group of circuits lands on its own protective device, so one faulty machine or lighting run trips alone.
  • Labelling, testing and paperworkEvery circuit is identified and written onto a schedule. The finished board is inspected and tested before the supply returns to normal use. The certificate and schedule stay with you when we leave.

How booking works

  1. Tell us about the job

    Tap Book Now and describe the work in the chat. Photos help.

  2. Get your price

    You see your price in the chat. A set price is paid at checkout; any other job is quoted first.

  3. Choose your visit

    Give your address and when you are free, and the visit is arranged.

Follow your job from booking to receipt

See when we're on our way, get your job report the moment we finish, and pay in seconds.

  • Track us on our way

    See us on the map with a live arrival time.

  • Your job report, same day

    See exactly what was done as soon as we finish.

  • Invoice and receipt in one place

    Pay online in seconds, and your receipt is always there when you need it.

Why choose MCI Electrical

Photo of David McInnesDavid McInnesElectrician
Trading since
2009
“I have worked on commercial premises across Eastleigh and Southampton since 2009. I quote the job, do the work and sign it off myself, so you always deal with the person who knows your building.”

David McInnes, MCI Electrical

Book Now

Photos of our work

Recessed LED panel lighting in a suspended ceiling for a commercial interior
Suspended linear LED lighting fitted in a modern open-ceiling workspace
LED panel lighting and electrical outlets installed in a commercial wash area
Decorative pendant and recessed lighting installed for a pharmacy retail fit-out
Suspended linear and track lighting during a forest-themed retail fit-out
Track lighting and entrance lighting installed in a commercial retail unit

Questions about distribution board replacement

Still have a question?

Do you replace distribution boards in Chandler's Ford?

Yes. MCI Electrical supplies and fits commercial distribution boards, from a straight swap of a worn unit to an upgrade with more ways for new machinery. The visit ends with a tested board, a circuit schedule and a certificate.

When does a distribution board need replacing?

Common reasons are a board marked down on a commercial EICR, which is the full inspection report on fixed wiring, warm or buzzing breakers, repeated trips and new machinery that needs more ways than the old unit offers.

Will the power be off while the board is changed?

Yes, the supply is isolated while the old board comes out and the new one goes in. We plan the shutdown with you on site first, and the length of the outage depends on how many circuits the board serves.

Can the new board be three phase?

Yes, when the incoming supply already supports three phase. Three phase is the supply used for larger motors and plant. A new three phase supply to the building is a separate job from the board itself.

What do I get when the board is in?

A new board matching the written quote, a schedule naming each circuit and a certificate. Insurers, landlords and the next EICR all ask for that paperwork, so it is kept together and left with you.

Book or ask a question

Calls answered 24/7