Distribution board replacement in Eastleigh
MCI Electrical replaces and upgrades commercial distribution boards for workplaces in Eastleigh, Chandler's Ford, Hedge End, Whiteley and Southampton. We survey the existing board, fit the new one and leave you with a tested installation.
“I have worked on commercial premises across Eastleigh and Southampton since 2009. I quote the job, do the work and sign it off myself, so you always deal with the person who knows your building.”
Who needs a new distribution board
- Workplaces book a board change when the old unit is worn, overloaded or flagged on a commercial EICR, which is a full inspection of the fixed wiring.
- When a fixed wire test finds a worn, damaged or overloaded board, we change it so the next inspection can pass.
- Warm busbars, buzzing breakers and trips in an Eastleigh workshop or shop usually mean the board has reached the end of its life.
- A new compressor, oven or three phase machine often needs extra ways and a higher rated incoming device.
What is and is not included
A commercial board change covers isolation, the new board and the tests that go with it.
Included
- Survey of the existing board and the loads it feeds
- Isolation of the incoming supply, with the network operator where that is required
- Supply and fit of the new distribution board
- Circuit identification and a schedule of circuits
- Inspection, testing and a certificate
Not included
- Building work, boxing in and making good of walls
- Rewiring of circuits beyond the tails at the board
- Out of hours isolation unless booked as emergency callout
What happens on the day
We carry out the board change in one visit where the load and isolation allow.
- 01
Arrival and isolation
We check the incoming supply, agree a shutdown window with you on site, and isolate the old board so the workplace is safe to work on.
- 02
Fit the new board
We remove the old unit, mount the new distribution board, terminate the incoming tails and land each circuit on its own device.
- 03
Test and certificate
We test the completed board, fill in the schedule of circuits and leave the certificate with you before we go.
How this is priced
A starting price of £950 buys a typical commercial distribution board replacement or upgrade, including isolation, the new board and a test certificate.
- Larger three phase boards, extra ways and out of hours isolation cost more than the starting figure.
- We confirm the written price after we have seen the existing board and the load it serves.
- Emergency lighting, data cabling and extra circuits on the same visit are priced on their own.
- Fixed wire testing is priced on the number of boards and circuits, not by the hour.
- Emergency lighting is priced per light, and the three hour test is priced separately.
- Repairs are priced item by item off the report, so you choose what to do and when.
- Work outside your trading hours costs a different rate, and I tell you what it is before I set off.
- Quotes are free, rescheduling is free, and there is no callout fee.
What you get
You are left with a new board that carries the workplace load and the paperwork that sits with it.
- Define the proposal
- The finished board matches the written quote: rating, number of ways, incoming device and how lighting, power and machinery are split.
- One fault stays on one circuit
- Each group of circuits sits on its own devices, so a fault on one machine or lighting run does not take the whole workplace down.
- Match any requested record
- The certificate and circuit schedule describe the board on the wall, ready for your insurer, landlord or next commercial EICR.
Where the rules come from
Commercial board work sits under the duty to keep workplace electrical systems safe.
- Electricity at Work Regulations 1989These regulations require workplace electrical systems, including distribution boards, to be constructed, maintained and used so they do not cause danger.
- HSE, electrical safety at workThe Health and Safety Executive sets out how employers should manage electrical risk, including boards, isolation and inspection in workplaces.
Why customers choose MCI Electrical
Boards are priced in writing before anything is ordered. The shutdown runs to the window we set, and the schedule on the door matches what is inside.
NICEIC
Book OnlineRecent work from MCI Electrical
These photographs show work completed across the wider service area covered by MCI Electrical; they are not all presented as distribution board replacement work.
Questions I get asked
These are the questions Eastleigh and Hampshire workplaces ask before a board change.
How much does a distribution board replacement cost?+
Distribution board replacement and upgrade starts from £950. Larger three phase boards and extra ways cost more once we have seen the existing unit.
— David McInnes
Will the power be off all day?+
The supply has to be isolated while we swap the board. Many small office boards are done in a few hours. A warehouse or dockside board can take longer if there are more circuits.
— David McInnes
Are you NICEIC registered?+
Yes. MCI Electrical is NICEIC registered and carries out the board work from quote to certificate.
Do you cover Southampton and the docks?+
Yes. We cover Eastleigh, Chandler's Ford, Hedge End and Botley, Whiteley and Segensworth, and Southampton and the docks.
Can you add three phase at the same time?+
If the incoming supply already supports it, we can fit a three phase board as part of the upgrade. A new three phase supply is a separate job, starting from £1,400.
Book Online
The age of the board and a rough circuit count are enough for a written figure.