Commercial distribution board upgrade in Whiteley
MCI Electrical replaces and upgrades commercial distribution boards in Whiteley, handling the survey, isolation, fitting and testing, and leaving a certificate for the new board.
Calls answered 24/7
- 17 years trading
- Local to Eastleigh
What does a distribution board replacement cost?
The price shown covers a commercial board replacement or upgrade, including isolation, the new board and the test certificate. It changes with the size and type of board, the number of ways and any isolation needed outside your trading hours.
From £950
- We confirm the written price once we have seen the existing board and the load it serves.
- A larger three phase board, or more ways than the old unit has, raises the price.
- Work outside your trading hours is charged at a different rate, and we tell you what it is before we set off.
- Quotes are free, rescheduling is free and there is no callout fee.
Commercial distribution board upgrade across Whiteley
We serve Whiteley from our base in Eastleigh.
What happens on the day
The board change starts with a look at the old unit and what it supplies, then moves through isolation, fitting and testing. We carry it out in one visit where the load and the isolation allow.
- Survey of the old board and its loadsWe look at the existing board, the incoming supply and the lighting, sockets and machinery it feeds. That decides the rating, the number of ways (the slots that each hold one circuit's protective device) and the written price.
- Isolating the supplyThe incoming supply is switched off and made safe before anything is touched, with the network operator involved where that is required. We settle a shutdown window with you on site, so you know when the power is going off.
- Removing the old unit and fitting the new oneWe take out the old board, mount the new one and connect the incoming tails, which are the heavy cables bringing the supply into the board. Each group of circuits then lands on its own protective device.
- Circuit identification and the scheduleEvery circuit is traced and marked, and its details go on a schedule of circuits that matches the board on the wall. Lighting, power and machinery are easy to tell apart afterwards.
- Testing and the certificateWe test the finished board before the supply is brought back for normal use. The certificate and the schedule of circuits stay with you when we leave.
How booking works
Tell us about the job
Tap Book Now and describe the work in the chat. Photos help.
Get your price
You see your price in the chat. A set price is paid at checkout; any other job is quoted first.
Choose your visit
Give your address and when you are free, and the visit is arranged.
Follow your job from booking to receipt
See when we're on our way, get your job report the moment we finish, and pay in seconds.
Track us on our way
See us on the map with a live arrival time.
Your job report, same day
See exactly what was done as soon as we finish.
Invoice and receipt in one place
Pay online in seconds, and your receipt is always there when you need it.
Why choose MCI Electrical
- Trading since
- 2009
“I have worked on commercial premises across Eastleigh and Southampton since 2009. I quote the job, do the work and sign it off myself, so you always deal with the person who knows your building.”
David McInnes, MCI Electrical
Book NowPhotos of our work
Do you replace distribution boards here?
Yes. Whiteley is a core area for MCI Electrical, including the Segensworth estates, Solent Business Park and the M27 junction 9 corridor. Distribution board replacement and upgrade is one of the services we carry out for commercial premises.
How soon can a distribution board replacement be booked?
You set the date with us when you book, and rescheduling is free if your plans change. The power shutdown window is settled with you on site before the supply is isolated.
Have you done this kind of work before?
Board replacement sits alongside fixed wire testing and EICR remedial works among the commercial services MCI Electrical carries out. MCI Electrical is NICEIC registered, and every new board leaves with a schedule of circuits and a test certificate.
What happens after I book a board change?
We survey the existing board and the loads on it, then confirm the written price. After that we settle the shutdown window with you, isolate the supply, fit the board, test it and leave the certificate with you.
Will the power go off while the board is changed?
Yes. The incoming supply has to be isolated while the old board comes out and the new one goes in. We settle the window for that with you on site first, so the shutdown fits around how the premises work.

