Commercial distribution board upgrade in Hedge End

MCI Electrical replaces commercial distribution boards in Hedge End, isolating the supply, fitting the new board and leaving a tested schedule of circuits and certificate behind.

Calls answered 24/7

  • 17 years trading
  • Local to Eastleigh

What does a distribution board replacement cost?

The price is built around the board itself: how many ways it needs, whether it is single or three phase and what load sits behind it. The from price covers a standard swap with its test certificate.

From £950

  • Bigger three phase boards and extra ways add to the price. So does isolation at a time other than normal trading, which has its own rate that you hear before we set off.
  • Quotes are free, rescheduling is free and there is no callout fee.
  • A new three phase supply, emergency lighting, data cabling and extra circuits are separate jobs, each with its own price.

Prices for commercial distribution board upgrade

Commercial distribution board upgrade across Hedge End

We serve Hedge End from our base in Eastleigh.

Hedge End Retail ParkCharles Watts Way and the trade countersTollbar WayBotley Road corridorWildern and Woodhouse LaneBotley village and Botley MillsBroad OakSO30

What happens on the day

A distribution board is the box on the wall that splits the incoming supply between lighting, sockets and machinery. Changing one follows the same order every time, from the first look to the certificate.

  • Looking over the old boardWe check the existing board and everything it feeds before a price is set: how many ways it has, which machines and lights hang off it and where the incoming supply arrives. That decides the rating and size of the new board.
  • Switching the supply offThe supply is isolated and made safe before anything is touched. We fix a shutdown window with you on site, and the network operator is brought in when the supply itself has to be switched off.
  • Swapping the boardThe old unit comes off and the new board goes on the wall. The incoming tails, the thick cables from the supply, are connected, and each group of circuits lands on its own protective device so one fault trips only its own circuit.
  • Testing and paperworkThe finished board is inspected and tested, every way is listed in a schedule of circuits, and the certificate is left with you before we go. Insurers, landlords and the next EICR, the fixed wiring inspection report, all read from it.

How booking works

  1. Tell us about the job

    Tap Book Now and describe the work in the chat. Photos help.

  2. Get your price

    You see your price in the chat. A set price is paid at checkout; any other job is quoted first.

  3. Choose your visit

    Give your address and when you are free, and the visit is arranged.

Follow your job from booking to receipt

See when we're on our way, get your job report the moment we finish, and pay in seconds.

  • Track us on our way

    See us on the map with a live arrival time.

  • Your job report, same day

    See exactly what was done as soon as we finish.

  • Invoice and receipt in one place

    Pay online in seconds, and your receipt is always there when you need it.

Why choose MCI Electrical

Photo of David McInnesDavid McInnesElectrician
Trading since
2009
“I have worked on commercial premises across Eastleigh and Southampton since 2009. I quote the job, do the work and sign it off myself, so you always deal with the person who knows your building.”

David McInnes, MCI Electrical

Book Now

Photos of our work

Suspended linear LED lighting fitted in a modern open-ceiling workspace
LED panel lighting and electrical outlets installed in a commercial wash area
Decorative pendant and recessed lighting installed for a pharmacy retail fit-out
Suspended linear and track lighting during a forest-themed retail fit-out
Track lighting and entrance lighting installed in a commercial retail unit
Recessed ceiling lighting installed above eyewear displays in an optician

Common distribution board questions

Still have a question?

Do you replace commercial distribution boards?

Yes, for businesses in Hedge End and the area around it. We survey the old board, change it, test the new one and leave a certificate with a schedule of circuits. That includes upgrades where the old board has run out of spare ways.

How long will the power be off?

The supply stays off while the board is swapped, and the time depends on how many circuits it carries. A small office board often takes a few hours, and a busier board takes longer. We set the shutdown window with you before work starts.

Are you NICEIC registered?

Yes, MCI Electrical is NICEIC registered. Every board change ends with inspection, testing and a certificate for the finished board, so the paperwork matches the work on the wall.

Can you fit a three phase board?

Yes, when the incoming supply already supports three phase, a three phase board can go in as part of the upgrade. If the building needs a new three phase supply, that is a separate job with its own price.

What paperwork do I get afterwards?

You get a certificate for the new board and a schedule of circuits listing what each way feeds. Both describe the board as it now stands, so an insurer, landlord or inspector can read them straight away.

Book or ask a question

Calls answered 24/7