Three-phase power in Hedge End
MCI Electrical installs three phase power for commercial units in Hedge End, from the intake to each machine, and finishes with tested circuits, a labelled board and an installation certificate.
Calls answered 24/7
- 17 years trading
- Local to Eastleigh
What decides the price of a three phase installation?
The price follows the length of cable, the number of machines, how much load each one draws and the new ways needed on the board. One short run to a single machine costs less than a long run feeding several.
From £1,400
- A new incoming supply is a separate job, because the network operator carries out and charges for the work on its own cables.
- Buying the machines, fitting motor starters and builders work such as cutting holes or making good are for other trades and are not in our electrical quote.
- If the existing supply is failing, tracing that fault is charged on its own, apart from the new installation.
- Work that has to happen when your business is closed carries a different rate, which we tell you before we set off. Rebooking is free and there is no callout fee.
Three-phase power across Hedge End
We serve Hedge End from our base in Eastleigh.
What happens on the day
A three phase job moves from the first look at the intake to the final certificate in four stages. Three phase is a 400 volt supply carried on three live cables, which is what large motors, ovens and compressors draw from.
- Surveying the intake and the loadsWe open up the intake and check the earthing, the spare ways and the incoming fuse rating. Then we list every machine that will run from the new supply, with its power rating. That list sets the cable size and shows whether the building has capacity or needs the network operator to upgrade the supply first.
- Making one board safe to work onWe switch off and lock off only the board that carries the new work, so other boards keep running where the wiring allows. Someone who knows the machines should be there when we start, to confirm which ones are about to go live.
- Running cable and fitting isolatorsThe three phase cable goes from the board to each machine position, supported on trunking or tray where it runs exposed. At every machine we fit an isolator, a switch that cuts power to that machine only. Each machine gets its own way on the board.
- Testing and certificateBefore switching on we measure continuity, insulation resistance and polarity on each new circuit. We then energise with you watching, label every way on the board and hand over the installation certificate with the test results.
How booking works
Tell us about the job
Tap Book Now and describe the work in the chat. Photos help.
Get your price
You see your price in the chat. A set price is paid at checkout; any other job is quoted first.
Choose your visit
Give your address and when you are free, and the visit is arranged.
Follow your job from booking to receipt
See when we're on our way, get your job report the moment we finish, and pay in seconds.
Track us on our way
See us on the map with a live arrival time.
Your job report, same day
See exactly what was done as soon as we finish.
Invoice and receipt in one place
Pay online in seconds, and your receipt is always there when you need it.
Why choose MCI Electrical
- Trading since
- 2009
“I have worked on commercial premises across Eastleigh and Southampton since 2009. I quote the job, do the work and sign it off myself, so you always deal with the person who knows your building.”
David McInnes, MCI Electrical
Book NowPhotos of our work
Do you install three phase power here?
Yes, we install three phase supplies for workshops, kitchens and plant rooms in commercial premises. Our cover includes Hedge End Retail Park, Charles Watts Way and the trade counters, Tollbar Way and the SO30 postcode.
How soon can I book a three phase installation?
Press Book Now and list the machines you want to run. A written quote comes before any visit, and our assistant answers calls at any hour. A booked visit can be moved without a fee.
Have you done three phase work before?
Yes. Three phase installation is one of our commercial services, and MCI Electrical is NICEIC registered. You deal with the same firm from the survey to the certificate.
Can my building take three phase?
That depends on what comes into the building. A unit with a three phase intake and spare ways can take new machines directly, while a single phase intake needs the network operator to upgrade it first. We check the intake before pricing the work.
What happens after I book?
We survey the intake and list your machines, then send a written quote naming each load, the cable size and where the isolators go. On the day we install and test, and the certificate comes to you.

