Machinery and trade additions
Installing dedicated 400V supplies for new machine tools, workshop compressors, or processing equipment in trading estates such as Chickenhall Lane and Segensworth.
Need three phase power for machinery, equipment or a growing commercial site? MCI Electrical assesses the supply capacity, expected load, distribution and cable route before installing and testing the new circuits. The service supports workshops, warehouses and industrial premises across Eastleigh, Southampton and nearby business parks.
The price follows the cable route and the length of the run rather than the equipment at the end of it. Quotes are free, there is no callout fee, and you see the full figure before I start.
Three phase is the heavier supply most machinery runs on, and the machine itself is usually the quick part. What takes the time is the route the cable has to take to reach it, through walls, along ceilings and around everything already up there.
Installing dedicated 400V supplies for new machine tools, workshop compressors, or processing equipment in trading estates such as Chickenhall Lane and Segensworth.
Running three phase main cables from main switchrooms to extra distribution boards in shared premises across Chandler's Ford and Millbrook.
Wiring heavy extraction systems, electric ovens, and refrigeration plant for hospitality and logistics units around Hedge End and the Southampton docks.
Here is what a three phase installation covers, and the work that gets arranged separately.
Three things make the quote accurate: where the machine is going, the details on its rating plate, and how I can get to your distribution board. Photographs of all three are usually enough.
Clear a space around the main three phase distribution board so the enclosure can be opened safely.
Ensure access to ceiling voids, containment runs, or wall routes where the new cable will run.
Identify any brief power interruptions needed when connecting the new circuit to your main board.
A tested three phase supply, an isolator right beside the equipment so the operator can cut the power without walking to the board, and the certificate the same day the work finishes.
Every job is carried out to current standards, fully tested and left tidy. You get the certificate the same day the work finishes, with a plain English summary you can act on, and a reminder when your next test is due. Quotes are free, rescheduling is free, and there is no callout fee. The same electrician quotes the work, does it and signs it off.
Get Free QuoteThe questions business owners usually ask before booking a three phase installation.
I look at the rating plate on your equipment. Heavy motors, large compressors, commercial ovens, and fast EV chargers usually require a 400V three phase connection to balance electrical load across all three incoming phases.
I plan the installation based on cable distance and mounting conditions. A simple local run from a nearby board takes less time than running containment across a high bay warehouse ceiling in Millbrook or Segensworth.
Your board must have a three pole circuit breaker space available. Older premises on estates like Woodside Avenue sometimes have full boards, which requires a board extension or extra board.
Phase rotation determines the directional spin of three phase electric motors. Testing phase sequence ensures pumps and machinery rotate in the correct direction when energized.
The official rules behind this work, straight from the source.
Eastleigh, Whiteley and Segensworth, Chandler's Ford, Hedge End and Botley, Southampton and the docks
Tell me what you need and you will get a free quote, with no callout fee. Send over a few details about your premises and the work you have in mind.