Correct starting load and cable sizing
Motors and heavy plant draw high initial inrush currents. Sizing conductors and protective devices correctly prevents nuisance tripping and keeps voltage drop within acceptable limits.
Installing new machinery or relocating commercial equipment? MCI Electrical designs and installs the dedicated power supply, isolation, protection and final connection required for the equipment and its load. The work covers workshops, warehouses and industrial premises across Eastleigh, Whiteley, Segensworth and the wider Southampton area.
The price follows the length of the run and the protection it needs along the way, not the machine at the end. Quotes are free, there is no callout fee, and you see the figure before anything is ordered.
A machine supply has to match the load stated on the machine, stay protected along its whole run so a knock or a forklift cannot damage it, and switch off somewhere the person using it can actually get to.
Motors and heavy plant draw high initial inrush currents. Sizing conductors and protective devices correctly prevents nuisance tripping and keeps voltage drop within acceptable limits.
Every piece of machinery needs a clearly labelled lockable isolator mounted within reach. This allows safe locking off during maintenance or emergency shutdown.
Workshops next to the docks in Millbrook or trade units in Eastleigh subject cabling to mechanical impact, vibration, and dust. Steel conduit or armoured cable protects conductors.
This is what a machine supply includes, and where separate work would be needed.
Send me a photograph of the machine rating plate and of where it is going to sit, and I can size the cable and price the run before I get there.
Ensure the path to the main distribution board is unobstructed so circuit installation and testing can proceed smoothly.
The machine should be in its permanent location so the isolator and final cable run can be measured and installed accurately.
Have the electrical rating plate or manufacturer specification sheet available to verify full load current and recommended protection.
A machine on its own protected supply with a lockable isolator beside it, tested and certified the same day the work finishes, with a plain English summary of what was installed.
Every job is carried out to current standards, fully tested and left tidy. You get the certificate the same day the work finishes, with a plain English summary you can act on, and a reminder when your next test is due. Quotes are free, rescheduling is free, and there is no callout fee. The same electrician quotes the work, does it and signs it off.
Get Free QuoteThe questions that come up most often about machine supplies.
If the existing board has a spare way with adequate physical space and electrical capacity, I can connect straight into it. If the board is full, as seen in many older trade units in Eastleigh and Chandler's Ford, I can install a dedicated extra board or discuss a board upgrade with you. - David McInnes
Yes, I install three phase supplies for heavy industrial plant as well as single phase connections for smaller workshops across Southampton and surrounding industrial parks. I match the installation to the required voltage and phase requirements on your machinery specification plate. - David McInnes
A lockable isolator within reach of the machine allows operators and engineers to disconnect power safely before undertaking repairs or routine maintenance. It prevents accidental switching back on while someone is working on the mechanical parts.
I need to know the kilowatt rating or full load current, starting method, phase requirements, and the exact physical position where the equipment will be installed relative to your distribution board.
The official rules behind this work, straight from the source.
Eastleigh, Whiteley and Segensworth, Chandler's Ford, Hedge End and Botley, Southampton and the docks
Tell me what you need and you will get a free quote, with no callout fee. Send over a few details about your premises and the work you have in mind.