Fleet and depot charging in Eastleigh
MCI Electrical fits fleet and depot charging for van parks and yards around Eastleigh, Chandler's Ford, Hedge End, Whiteley and Southampton. We run the quote, the install and the paperwork ourselves so you deal directly with MCI Electrical throughout.
Calls answered 24/7
- 17 years trading
- Local to Eastleigh
How this is priced
Fleet and depot charging installation starts from £75 an hour. That rate covers the electrician on site fitting posts, cable and the board work for your vans or yard.
From £75 an hour
Included
- A look at the intake, the distribution board and the bays where the vans will stand
- Cable, containment, posts or wall units and the protective devices for those chargers
- Load check so the chargers sit within the supply you already have, or a written note if the board needs an upgrade first
- Testing, labelling of the new circuits and the certificates for the install
- A walk round at the end so the person who locks the yard knows how to isolate a post
Not included
- Grant forms you send to the scheme yourself
- New concrete bases, tarmac cuts or fencing unless you book a groundworker beside us
- A standing maintenance visit; we do not sell plans
- The figure is a starting price, not a fixed total. Hours depend on how many posts you need and how far the cable run is from the board.
- If the yard needs a larger distribution board or a new three phase feed, those sit on their own prices and we write them on the quote first.
- Out of hours attendance is a separate callout rate if you book work outside the usual hours.
- Fixed wire testing is priced on the number of boards and circuits, not by the hour.
- Emergency lighting is priced per light, and the three hour test is priced separately.
- Repairs are priced item by item off the report, so you choose what to do and when.
- Work outside your trading hours costs a different rate, and I tell you what it is before I set off.
- Quotes are free, rescheduling is free, and there is no callout fee.

Who books fleet charging in Eastleigh
Yard managers, hauliers and workshop owners around Eastleigh book this when vans sit overnight with nowhere to plug in, or when a new bay on the industrial estates needs power for a mixed fleet.
- Van parks and small depotsFirms on Chickenhall Lane, Barton Park and the railway side of Eastleigh want two or four posts for vans that come back after the last drop. We size the feed from the existing board so the chargers do not trip the lights in the unit.
- Workshops and plant yardsGarages and plant hire near Hedge End, Botley and Chandler's Ford need a dedicated bay for a recovery truck or a van with tools still on board. The work is the cable, the post and a clear isolator the night shift can use.
- Dock and warehouse parkingUnits around Southampton docks, Whiteley and Segensworth often have a row of bays against a fence with no spare ways on the board. We plan the run from the intake, not from a socket on the wall.
- Growing a mixed fleetOwners adding electric vans beside diesels want the first posts in without ripping the yard up twice. We leave spare ways and an isolator marked up so the next pair of posts can go in later.
What happens on the day
You get clear company responsibility throughout from arrival to the last certificate. We work around vans that still need to leave the yard.
- Arrival and isolationWe meet you or the yard lead, confirm the bays, isolate the board ways we will use and set out cable so forklifts and cars can still pass.
- Fit the posts and the feedWe run the cable, mount the posts or wall units, terminate at the board and set the protection for each charger.
- Test and hand over the papersWe test every new circuit, fill the certificates, show you the isolators and leave the paperwork with you before we go.
Fleet and depot charging near you
How booking works
Tell us about the job
Tap Book Now and describe the work in the chat. Photos help.
Get your price
You see your price in the chat. A set price is paid at checkout; any other job is quoted first.
Choose your visit
Give your address and when you are free, and the visit is arranged.
Follow your job from booking to receipt
See when we're on our way, get your job report the moment we finish, and pay in seconds.
Track us on our way
See us on the map with a live arrival time.
Your job report, same day
See exactly what was done as soon as we finish.
Invoice and receipt in one place
Pay online in seconds, and your receipt is always there when you need it.
Why choose MCI Electrical
- Trading since
- 2009
“I have worked on commercial premises across Eastleigh and Southampton since 2009. I quote the job, do the work and sign it off myself, so you always deal with the person who knows your building.”
David McInnes, MCI Electrical
Book NowPhotos of our work
How much does fleet and depot charging cost?
Installation starts from £75 an hour. A short two post job on a board with spare ways is a few hours. A long run across a yard, or a board that needs new ways first, takes longer and we write that on the quote.
Can you use the Workplace Charging Scheme?
Many yards can claim toward workplace posts. We fit the chargers and give you the certificates the scheme asks for. You send the claim. We do not file it for you.
Do I need three phase for depot posts?
A couple of slow posts can sit on a strong single phase board. Several vans overnight, or faster units, usually need three phase. We check the intake in Eastleigh, Chandler's Ford, Hedge End, Whiteley or Southampton before we price the hours.
Will the chargers trip the rest of the unit?
Not if the board and the cable are sized for the load. That is the first check. If the board is already full, a replacement or upgrade is a separate starting price from £950.
Who do I deal with on the day?
You deal with MCI Electrical from the written quote through to installation and certification. Calls are answered at any time, while booked work follows the usual hours unless you request an out of hours callout.

