Commercial electrician in Eastleigh
Need a commercial electrician in Eastleigh? MCI Electrical provides fixed wire testing, distribution work, lighting upgrades and electrical repairs for local business premises.
Calls answered 24/7
- 17 years trading
- Local to Eastleigh
Services in Eastleigh
Commercial EICR
from £195
Emergency lighting testing
from £145
Commercial distribution board upgrade
from £950
EICR remedial work
from £65 an hour
Emergency lighting
from £195
PAT testing
from £95
Three-phase power
from £1,400
Machinery power supply
from £480
Electrical fault finding
from £75 an hour
Emergency electrician
from £105 an hour
LED lighting upgrade for offices
from £480
LED high bay lighting
from £680
Workplace EV charger installation
from £1,250
Fleet and depot charging
from £75 an hour
Data cabling
from £420
CCTV installation
from £1,450
Commercial electrical fit-out
from £2,400
Starlink installation
from £350
Parts of Eastleigh we cover
Our base is in Eastleigh.
Nearby areas
How booking works
Tell us about the job
Tap Book Now and describe the work in the chat. Photos help.
Get your price
You see your price in the chat. A set price is paid at checkout; any other job is quoted first.
Choose your visit
Give your address and when you are free, and the visit is arranged.
Why choose MCI Electrical
- Trading since
- 2009
“I have worked on commercial premises across Eastleigh and Southampton since 2009. I quote the job, do the work and sign it off myself, so you always deal with the person who knows your building.”
David McInnes, MCI Electrical
Book NowPhotos of our work
How often does a commercial property need an electrical inspection?
Commercial premises generally require fixed wire testing at least once every five years, while industrial installations with higher operational wear often require inspection every three years. The recommended testing frequency depends on property usage and the condition noted on your previous report.
Can commercial electrical work be carried out outside normal trading hours?
Yes, scheduled works can be booked outside normal operating hours to avoid business disruption or plant shutdowns. Specific rates apply to out of hours appointments, and these details are confirmed before attendance.
What is included with an emergency lighting inspection?
Emergency lighting testing includes inspecting luminaire operation under simulated power failure conditions, checking charging indicators, and completing the full three hour battery discharge duration test alongside logbook documentation.
Do you install three phase power supplies for machinery?
Yes, we install three phase switchgear, sub distribution panels and dedicated supplies for industrial processing machinery, extraction systems and commercial refrigeration units.
What happens if our commercial EICR identifies electrical defects?
If an inspection uncovers non compliant or dangerous items, the report lists them with standard severity codes. We provide an itemised breakdown for the remedial repairs so you can plan necessary corrective works.
